Installing above-ground main on Vanderlip Trail and Drive

Summary: We have expanded the Vanderlip Trail main replacement to also include a portion of Vanderlip Drive.

Current status: The City of Rancho Palos Verdes has cleared the vegetation within the Vanderlip Trail area, and design is underway.

We plan to replace about 1,000 feet of existing water main with above-ground main along the Vanderlip Trail. Due to more recent land movement, we also now plan to replace existing water main along Vanderlip Drive with above-ground main and install a swing joint ahead of the larger Narcissa Drive project. Engineering crews and a geotechnical consultant will be conducting a site walk the week of March 11 to assess the alignment in this area.